Home
Pumps
Gates and
Valves
Instruments
Process Equipment
Online Store
Water news for March 5 -
Mobile-home park to close because it can't afford $250,000 sewer upgrade
Sludge Mixing Gun Quotes
Navigation
PumpStoreUSA.com
>
Anaerobic Digestion
>>
Sludge Mixing Guns
>>>
Quotes on Sludge Mixing Guns
Summary
Sludge mixing guns designed to help maintain the appropriate temperature and mixing balances in anaerobic digesters for optimal performance
Related
anaerobic digestion
digester covers
energy recovery
Can't find it?
If you're having trouble finding something here, let us know:
Your e-mail:
What you need:
D.J. Gongol and Associates, Inc.
4801 Pommel Place
West Des Moines, Iowa 50265-2938
515-223-4144
515-223-5169 fax
www.gongol.net
home
•
about
•
search
contact
•
water news
•
RSS
emergencies
•
online store
Please fill out the following form to receive a quote. We will respond by e-mail unless you indicate otherwise.
Note:
Please complete the form to the best of your ability. The more information you can share here, the faster we will be able to process your request.
first name
last name
organization
address
city
state
ZIP
country
e-mail
phone
fax
project name
step 1:
select installation
(please select)
fixed cover
floating cover
other
step 2:
enter dimensions
please enter all available
sludge volume (cubic feet)
number of sludge mixing guns required
cover diameter (feet)
diameter of digester at bottom of cone (feet)
cover floating distance (feet)
(top of straight sidewall to lowest cover level)
height of straight sidewall (feet)
(top of straight sidewall to bottom of straight sidewall)
normal sludge level (feet)
(measure from bottom of cone)
total digester height (feet)
(top of straight sidewall to bottom of cone)
digester sludge capacity (gallons)
gas capacity (cubic feet)
step 3:
heating
sludge heater
(please select)
yes
no
re-use existing
supplied by others
heater power (btu)
heater energy source
(please select)
sludge gas
oil
sludge gas and oil
propane gas
electric
other
automatic change-over required
(please select)
yes
no
step 4:
urgency
I'm just curious
I need specification data
project is in planning stages
project will be bid or bought soon
I needed to order this yesterday
step 5:
other
Anything else we should know about your needs?
step 6:
submit
last revised March 2010