Home
Pumps
Gates and
Valves
Instruments
Process Equipment
Online Store
Water news for January 10 -
More upstream storage may offer some breathing room along the Missouri
Turbidity Barrier Quotes
Navigation
PumpStoreUSA.com
>
Turbidity Barriers
>>
Turbidity Barrier Quote Request
Summary
Turbidity barriers control suspended solids and turbidity generated by dredging and provide the last line of defense against sediment migration into a marine environment
Related
lagoon liners
lagoon baffles
lagoon covers
stormwater tanks
secondary containment
D.J. Gongol and Associates, Inc.
4801 Pommel Place
West Des Moines, Iowa 50265-2938
515-223-4144
515-223-5169 fax
www.gongol.net
home
•
about
•
search
contact
•
water news
•
RSS
emergencies
•
online store
Please fill out the following form to receive a quote. We will respond by e-mail unless you indicate otherwise.
Note:
Please complete the form to the best of your ability. The more information you can share here, the faster we will be able to process your request.
your name
organization
address
country
e-mail
phone
project name
step 1:
select type of curtain required
Type 1 turbidity curtain (for ponds, shallow lakes, small streams, and marshes)
For protected areas with no current, sheltered from wind and waves
Type 2 turbidity curtain (for lakes, streams, and tidal areas)
For areas with slow currents, up to 2 knots or 3.5 feet per second
Type 3 turbidity curtain (for waters with strong currents)
For areas with fast currents, up to 3 knots or 5 feet per second, or where the curtain is subject to strong tides, winds, or wave action
step 2:
enter dimensions
length (in feet)
depth (in feet)
step 3:
select duration
short-term installation (less than three months)
long-term installation (three months to one year)
permanent installation (one year or more)
step 4:
select type of material
permeable
impermeable
step 5:
other requirements
must be USDOT approved
no specification required
step 6:
urgency
I'm just curious
I need specification data
project is in planning stages
project will be bid or bought soon
I needed to order this yesterday
step 7:
other
Anything else we should know about your needs?
step 8:
submit
last revised March 2010